Georgetown had a large water treatment facility which needed to be demolished. There were large containment tanks with concrete supported by rebar for structural soundness.  We needed to use a pulverizer to break the concrete and separate out all the metal bars and a hammer to break large pieces of concrete into smaller, more manageable pieces.

Project Planning

The project planning process included:

  • Communication of needs
  • Outline of project
  • Assessment
  • Equipment Preparation
  • Demolition
  • Cleanup
  • Debrief and final assessment

The planning and execution is typically simple and straightforward. Our team of professionals are able to provide a thorough inspection and assessment of the building before the demolition takes place and throughout the process. We follow through with the project manager to ensure a satisfied completion of the demolition project.